This is how you build a driveway on a hillside.
A pump truck was used to pump the concrete to the bottom of the drive near the house.
In our case, that was a long way.
Here is Phil's brother, Bob, giving us help. Phil, his brother, and Billy Ray put the heat cables in the driveway so that it will melt the ice and snow so we can get out of here in the wintertime.
They ordered the material from the manufacturer and installed it for a fraction of the cost to hire someone. Of course, brothers are cheap, really cheap labor. Thanks Bob.
Here is a picture of the concrete company finishing the concrete.
And finally, after 2 months of parking at the top of the hill and walking down, here is my car making the maiden voyage to the bottom. And just like a subaru, my camry pulled out without even a skid mark.







